Friday, August 22, 2008
Thursday, August 21, 2008
Rushing the model...
Monday, 11 August 08
I finished half of the model during the weekend. I planned to complete it as soon as possible so that i have the time to take photographs and do the layout. My 16 tiles are not completed yet too. I hope to complete my model by tomorrow and get the photographs printed on the A1 sheet on thursday.
I used paint markers to colour the tiles.
Sunday, August 10, 2008
submission on Monday....
Friday, 08 August 08
Today, all of us are rushing our work because monday is the date for submission.
Today, all of us are rushing our work because monday is the date for submission.
We were informed in the afternoon that the submission date had changed to friday. Therefore, we were given more time to finish up our model. So I spent the whole day in the workshop and cut the materials. Before I mark out on the materials, I try out some of the shapes on cardboard and ZO cards first.
Thursday, August 07, 2008
Marking model….
Wednesday, 06 August 08
Today, I spent the whole morning in the workshop making my model. After our CD lesson ends, I went back to the workshop again and continue doing my model.
Today, I spent the whole morning in the workshop making my model. After our CD lesson ends, I went back to the workshop again and continue doing my model.
Tuesday, August 05, 2008
Submission…
Monday, 04 August 08
Term 1
1. Tutti Fruitti
2. Drawing is copying
3. Out of Order
4. Transferring of Hands & Feet
5. Body Language
6. Something’s old, something’s new
The projects that we need to submit for design studio:
1. Ontography Drawings
2. Escher’s Relativity Model
3. 16 Templates
4. 3 Tessellation Drawings with Formula – Colour, Tone and Pattern
5. 3 mock up Models based on One of the Tessellation Drawings
6. 1 mock up Model using Zo Cards
We submitted our drawing portfolio at 10am and Design studio project at 3pm in our own studio today.
Assignments that we need to include in our portfolio:
Assignments that we need to include in our portfolio:
Term 1
1. Tutti Fruitti
2. Drawing is copying
3. Out of Order
4. Transferring of Hands & Feet
5. Body Language
6. Something’s old, something’s new
Term 2
7. What is that?
8. I see dead spaces
9. point perspective (A3 colour pencil rendered)
10. 2-point perspective (A3 marker rendered)
These are the some of the drawings:
7. What is that?
8. I see dead spaces
9. point perspective (A3 colour pencil rendered)
10. 2-point perspective (A3 marker rendered)
These are the some of the drawings:
The projects that we need to submit for design studio:
1. Ontography Drawings
2. Escher’s Relativity Model
3. 16 Templates
4. 3 Tessellation Drawings with Formula – Colour, Tone and Pattern
5. 3 mock up Models based on One of the Tessellation Drawings
6. 1 mock up Model using Zo Cards
After the first submission, I went to the workshop to continue making my model and went back to the studio at around 2.30pm to prepare for the next submission.
Subscribe to:
Posts (Atom)